Framing has started. The framers said it would take about 2 1/2 weeks to get it dried in. Hopefully, we have good weather until that is done. It is exciting to see the house start to take shape.
Here is a shot of the load bearing walls that were the first walls to be put up. (photo looking from the main floor into the basement) |
Floor joists were laid over the foundation. |
The framers have laid plywood over the joists and are working on the outer walls. That is the kitchen that has the walls up. |
The framers came in on Saturday to work. Here is what it looked like after they left. (photo taken from the garage) |
This is the view outside of Sarah's window. |
Here is the view out of Noah's room. |
Here is the view from the corner bathtub in the Master Bath. |
These will be the windows in our Master Bedroom. |
Here is the nook in the eating area. They haven't cut the windows out yet. On the right in the nook is the back patio door. |
This is the window over the sink. |